Industrial Bulk manufacturing facility
Established 1999

27 Years of Excellence inIndustrial Packaging

We manufacture standard, food-grade, conductive, breathable, and UN-certified FIBC bulk bags for chemicals, agriculture, food ingredients, minerals, and industrial materials, helping global buyers secure reliable packaging for safe storage, handling, and transport.

500M+
500M+ Bags Manufactured
50+
50+ Countries Served
99.8%
99.8% Quality Rating
24/7
24/7 Customer Support
Established 1999

27 Years of Excellence inIndustrial Packaging

We manufacture standard, food-grade, conductive, breathable, and UN-certified FIBC bulk bags for chemicals, agriculture, food ingredients, minerals, and industrial materials, helping global buyers secure reliable packaging for safe storage, handling, and transport.

Company Address

Middle section of Taoshan Street, Guantao County, Handan City, Hebei Province

Advanced Equipment

From weaving to printing, all processes follow strict standards with full inspection.

Expert Team

Our engineers customize FIBC solutions for diverse industrial demands.

Our Mission

To provide innovative, reliable, and sustainable bulk packaging solutions that enable our customers to transport and store their products safely and efficiently, while maintaining the highest standards of quality and environmental responsibility.

吨袋生产设备
工业仓储包装区域
生产线质量检验
叉车搬运工业货物
工业厂区与物流配送
吨袋生产设备
工业仓储包装区域
生产线质量检验
叉车搬运工业货物
工业厂区与物流配送

Company Information

A China-Based Bulk Bag Factory Focused on Reliable Industrial Packaging

From material selection and fabric cutting to sewing, inspection, and export packing, we manage each production step with attention to strength, consistency, and delivery reliability, helping buyers source practical FIBC solutions with stable quality and responsive service.

Item
Details
Founded
1999
Factory Location
Handan, Hebei, China
Main Products
Standard FIBC, conductive bulk bags, food-grade ton bags, breathable FIBC, inner liner bags, aluminum foil bags, UN-certified dangerous goods bags
Material Options
100% virgin PP, PE liner, aluminum foil barrier, anti-static fabric, UV-resistant fabric
Loading Range
500 kg - 3,000 kg, depending on bag structure
Safety Factor
5:1 available
Monthly Capacity
50,000 pcs for selected models
MOQ
100 pcs / 2,000 pcs depending on product type
Why Choose Us

Why Global Buyers Choose BulkBag B2B

We combine 27+ years of FIBC manufacturing experience, application-based bag design, strict quality control, and responsive export service to help buyers source reliable bulk packaging with less risk.

25+ Years Experience

Focused on FIBC bulk bag manufacturing since 1999.

Custom FIBC Solutions

Custom sizes, liners, loops, top/bottom styles, and printing available.

Application-Based Design

Bag structures recommended according to material, load, and use condition.

Strict Quality Control

Key details checked before shipment, including fabric, stitching, loops, and packing.

Wide Industry Use

Serving chemicals, food, agriculture, minerals, construction, and waste handling.

Export Support

Fast quotation, clear communication, packing details, and WhatsApp/email support.

Production Process

From Material to Finished Bulk Bags

Our production process focuses on fabric strength, accurate cutting, reinforced sewing, and final inspection to ensure each bulk bag is ready for safe loading and export shipment.

Bulk bag production equipment
01

Material Selection

PP fabric, liners, loops, and accessories are selected according to the application.

Industrial warehouse packaging area
02

Cutting & Printing

Fabric panels are cut and printed based on confirmed specifications.

Manufacturing line quality control
03

Sewing & Reinforcement

Loops, seams, top, and bottom structures are sewn and reinforced.

Forklift handling industrial goods
04

Liner / Special Treatment

PE liner, aluminum foil, breathable, anti-static, or UV-resistant options are added as needed.

Industrial facility and logistics
05

Quality Inspection

Size, stitching, loops, printing, cleanliness, and packing details are checked.

Industrial facility and logistics
06

Packing & Shipment

Finished bags are folded, packed, labeled, and prepared for export delivery.

Bulk bag order confirmation and packing
Order Confirmation

BUY WITH CONFIDENCE

Clear Confirmation Before Every Bulk Bag Order

We help buyers confirm bag structure, material options, quality details, and export packing before production and shipment, making FIBC sourcing more transparent and reliable.

Bag Structure Confirmation

Confirm bag size, SWL, safety factor, loop type, top style, bottom style, and liner requirement.

Material & Application Match

Recommend PP fabric, coating, PE liner, aluminum foil barrier, anti-static, breathable, or UV-resistant options based on the material being packed.

Drawing or Sample Review

Provide product drawings, sample photos, or sample discussion before bulk production when required.

Production Progress Updates

Share production photos or key progress updates during cutting, sewing, liner insertion, and packing.

Pre-shipment Quality Check

Check bag size, stitching, lifting loops, printing, liner condition, cleanliness, packing quantity, and shipping marks.

Export Packing Confirmation

Confirm bale packing, pallet packing, labels, export marks, and container loading preparation.

Available on request: product drawings | material details | sample photos | inspection photos | packing photos | shipping document support

Quality Assurance

Certifications & Compliance

Our quality commitment is supported by recognized certifications, testing documents, and compliance records for international buyers.

Export sample enterprise certificate placeholder

Export Sample Enterprise Certificate

ISO 9001 quality management certificate placeholder

ISO 9001 Quality Management

Food safety system certification placeholder

Food Safety System Certification

Enterprise recognition certificate placeholder

Top Enterprise Recognition

Quality inspection report placeholder

Quality Inspection Report

Production compliance file placeholder

Production Compliance File

Export documentation placeholder

Export Documentation

Factory audit record placeholder

Factory Audit Record